After welding and painting the frame for the tongue, I mounted the HVAC unit.
Then set it on the tongue.
Then added the batteries (in battery boxes) and the inverter assembly is mounted in the plastic toolbox on top of the frame.
The whole unit is bolted to the tongue with heavy U-bolts.
Thanks For sharing this Superb article.I use this Article to show my assignment in college.it is useful For me Great Work.
ReplyDeleteNational Air Warehouse